History

ホーム > GLOBAL & TOPIC > CN-55 > 事業所情報 英語 > History

■History


■言語選択


■レイアウト


■List

サムネール タイトル 内容 コメント イメージ ファイル
1981 Shenzhen Buji lauched OEM business of COIL pre–processing.. Shenzhen Buji lauched OEM business of COIL pre–processing..
1983 Termination of OEM, and launched new Processing contract. Termination of OEM, and launched new Processing contract.
1988 Completion of the second factory–COIL PINT TYPE production started, production of molded parts started Completion of the second factory–COIL PINT TYPE production started, production of molded parts started
1992 Third factory completed–COIL imposition type production started. Third factory completed–COIL imposition type production started.
1997 MODULE begins production of dielectric filters MODULE begins production of dielectric filters
2002 Started production of in–vehicle electrical components Started production of in–vehicle electrical components
2006 Moved the factory to Longgang and established Sheng Long Toko Technology Moved the factory to Longgang and established Sheng Long Toko Technology
2007 Full–scale production of Baolong / Shanglong workshop power on. Full–scale production of Baolong / Shanglong workshop power on.
2016 After scheduling the Baolong factory a sole proprietorship company, Baolong Toko absorbed and merged to Sheng Long Toko. After scheduling the Baolong factory a sole proprietorship company, Baolong Toko absorbed and merged to Sheng Long Toko.

Murata Manufacturing Co., Ltd.

Copyright (c) Murata Manufacturing Co., Ltd. All Rights Reserved.